Why Legacy PLC-to-AASX Uses Loader, Log, Logic & Gap Separation#
Deployed PLC code alone loses original planning context as field edits accumulate. DualSoft's brownfield concept cross-checks Loader (topology), Log (observed events), and Logic (rules), surfacing mismatches in a separate Gap Review Queue—the same honesty principle behind EMPTY_UNSET and NOT_RUN here.
Scope and Verification FAQ#
Has this reference package been tested in Eclipse BaSyx Part 2 API?
BaSyx API 3.0: upload / 135 ID lookups. The recorded check used one fixed runtime and sample with separate automated reproduction. Attachment HTTP download, re-export, full API conformity and physical acceptance remain outside that result.
Does format checking cover vendor PLC IDE import or shop-floor commissioning?
Vendor PLC IDE import not executed Not yet checked, and Physical commissioning outside this reference scope Not yet checked. Customer-specific IDE and physical tests require explicit joint scoping.
Is SequenceControlData 1/0 an official IDTA Submodel Template?
No. SequenceControlData 1/0 is a DualSoft-defined namespace with English ConceptDescriptions and is excluded from IDTA template conformance comparisons.
Why are some Nameplate fields empty (EMPTY_UNSET) in the reference package?
Because this public package models a generic equipment Type rather than a private customer machine, instance-specific values such as site addresses or serial numbers are intentionally left unset. In a real project, mandatory fields are mapped from your source records and checked against your acceptance criteria.
Scope and deliverables are agreed together before any customer data is handled.