EQUIPMENT ASSET MANAGEMENT · REAL CONTROL

Design equipment controls.
Manage asset data with AAS.

Model how a machine runs in DS Studio. Use an Asset Administration Shell (AAS) to organize its data, then identify which PLC signals to monitor with DS Pilot.

Actual demo screens · simulation, no plant or PLC connected

Asset & Control Architecture

Design, asset management,
and real control in one.

Author models in DS Studio, manage equipment assets in AAS, and connect real control and diagnosis with DS Pilot.

Solid arrows show model registration and signal definitions. The dashed arrow shows how field results inform design review. The lower diagram shows the PLC and its inputs and outputs.
Explore the roles within the DS Pilot family
DS Pilot

Real Control Execution

Scope the interfaces and acceptance checks connecting verified process sequences to PLC/PC equipment control and AAS repositories.

Explore DS Pilot
DS Pilot Dashboard

Live Operating Visibility

Define operating states, waiting interlocks, and process context operators and engineers need when equipment pauses.

Explore Dashboard
DS Pilot Equipment Doctor

Equipment Diagnosis

Agree on timing signals and diagnostic evidence needed to trace cycle drift and recurring anomalies during maintenance.

Explore Equipment Doctor

Each card explains the capability role in plant operations. Actual equipment integration and acceptance checks are scoped per project.

Deployment & Collaboration

Scope asset management and control by role.

Align equipment records, PLC control handover, and AAS repository verification by team.

COLLABORATION

Manufacturing teams

Work to scope
Scope standard AAS equipment asset management and verified control handover boundaries.
What to prepare
Shareable nameplate fields, control sequence sheets, equipment boundary, and target AAS/control setup.
Agreed result
Agreed asset mapping sheet, control interface boundary, and clear pre-adoption checks.
Prepare the scope checklist
COLLABORATION

System integrators

Work to scope
Divide repeatable PLC-to-AAS asset mappings from real control commissioning exceptions.
What to prepare
Sample tag or sequence structure, target IDTA templates, and client control handover rules.
Agreed result
Scoped asset mapping sheet and control/exception checklist before client delivery.
Inspect the reference package
COLLABORATION

Technology partners

Work to scope
Verify asset data exchange and control-reference lookups with an existing AAS repository or MES.
What to prepare
Identifier conventions, AAS model and API versions, and expected query/control patterns.
Agreed result
Agreed payload/interface boundary and reproducible target-environment verification steps.
Read AAS foundations

DualSoft.ai tools and guides

Verification & Learning

Start from verified asset & control evidence.

Use the scoping checklist, v3.2/DPP migration notes, and public identifier reference directly in engineering reviews.

Asset & Control Scope

Which equipment will you manage and control?

Open email directly

Share source format, control target, and AAS setup. We align scope before file transfer.

help@dualsoft.com

Drafts stay in this tab until you send email.

Scope inquiry & draft

Selected reference item: Process sequence

Describe format and goal. Keep confidential files out.

Open email directly

Review the email draft
  1. Review source formats, control targets, and target AAS environment
  2. Map required, missing, and control-exception fields against our reference
  3. Agree on secure channels, deliverables, and commissioning checks first

Scope and deliverables are agreed together before any customer data is handled.

Content reviewed Prepared by: DualSoft · website content
opens in a new tab