Equipment Asset Management (AAS) & Control Scope Checklist

Organize your equipment asset management (AAS) and control integration scope with eight practical questions covering source data, target servers, control exceptions, and acceptance criteria before sharing confidential files.

AAS / INTEGRATION

Questions to scope together#

Choose questions to discuss or copy

Checking an item selects a question to discuss or copy—it is not a readiness, pass, or adoption judgment, and undecided items can be selected too. Print the full list for internal alignment; selections are never saved or submitted.

Illustrative undecided-item note (example only, not a customer case): Target environment: undecided / Current materials: first check whether a non-confidential tag list is available / To align together: validation tool and execution owner.

  1. #

    Which files or records (e.g. PLC tag CSV, sequence Excel sheet, DS2 source, or 3D GLB/STEP) will be mapped, and who can clarify field meanings?

    Acceptance check Identify the source format, key columns/fields, revision, and responsible contact, and agree on a non-confidential review sample.

  2. #

    Does the mapping describe a single machine or an entire line, and should it represent a catalog Type or a serialized Instance?

    Acceptance check Define the equipment or process boundary, Type versus Instance classification, identifiers, and which sub-assets are included or excluded.

  3. #

    Which fields are mandatory for the receiving team (e.g. manufacturer name, serial number, process steps, units), and which are optional or currently unknown?

    Acceptance check Map required, optional, and unknown values to source fields, and agree on units, formats, and how empty values (EMPTY_UNSET) are handled.

  4. #

    Which AAS tool or server (e.g. Eclipse BaSyx, AASX Package Explorer, or an internal repository) and specification version (v3.0 or v3.2) will validate the output?

    Acceptance check Name the target tool or server and AAS metamodel/API versions, and agree on the exact file checks or API lookups to run.

  5. #

    Which official IDTA templates (e.g. Digital Nameplate, Models3D) and custom submodels (e.g. SequenceControlData) are needed together?

    Acceptance check Keep official templates distinct from custom definitions, and record template versions, semanticId rationale, and template-diff boundaries.

  6. #

    Which items cannot be mapped reliably from tag names alone and require a controls engineer's interpretation or exception rule?

    Acceptance check Separate automatic mappings, manual engineering decisions, and unverified items, with clear decision owners for each exception.

  7. #

    What exact test input, procedure (e.g. aas-test-engines check, BaSyx upload and ID lookup), and expected outcome will determine acceptance?

    Acceptance check Agree on test inputs, steps, expected observations, and reviewer, and state how failed or unexecuted checks affect acceptance.

  8. #

    Who is authorized to share and receive review material, through which secure channel, and under what retention or deletion rules?

    Acceptance check Start with minimal non-confidential samples, and agree on sharing approval, recipients, transfer channel, access scope, and retention/deletion terms before exchanging customer files.

Selected items: 0

Deployment & Collaboration

Scope asset management and control by role.#

Align equipment records, PLC control handover, and AAS repository verification by team.

COLLABORATION

Engineering Buyers#

Work to scope
Prioritize the submodels and verification checks needed for your first plant scope.
What to prepare
Current source file formats, required IDTA templates, and internal acceptance owner.
Agreed result
A practical scope checklist separating confirmed inputs from open questions.
COLLABORATION

Integration Partners#

Work to scope
Align automatic mapping boundaries, manual exception handling, and handover criteria.
What to prepare
Identifier scheme, target AAS model/API versions, and exception decision owners.
Agreed result
An agreed review workflow and client handover boundary.

Verified Facts and Scope Boundaries#

  • AAS server verificationBaSyx API 3.0: upload / 135 ID lookups

    Separate automated runs verified upload and ID lookups on BaSyx 2.0.0-milestone-15. Full API conformity and physical commissioning remain separate.

  • PLC engineering-tool importVendor PLC IDE import not executed Not yet checked

    Importing a project directly into a specific PLC vendor's engineering IDE has not yet been tested.

Reference Guides#

Scope and Verification FAQ#

Can we start scope review before an Eclipse BaSyx server is running?

Yes. The current API verification status is BaSyx API 3.0: upload / 135 ID lookups, so early scoping focuses on source formats, required submodels, and acceptance targets.

Are vendor PLC IDE imports included automatically in a mapping pilot?

Vendor PLC IDE import not executed Not yet checked. Direct vendor IDE verification is agreed explicitly per target controller family.

Can we send the checklist even if several items are still undecided?

Yes. Checking an item selects which questions you want to discuss or copy—it does not mean the item is ready or passed. You can select undecided items such as target environment or acceptance criteria so we can narrow them down together during scoping.

What happens after you email us#

  1. Review source formats, control targets, and target AAS environment
  2. Map required, missing, and control-exception fields against our reference
  3. Agree on secure channels, deliverables, and commissioning checks first
Content reviewed Prepared by: DualSoft · website content

Scope and deliverables are agreed together before any customer data is handled.

Back to top

opens in a new tab