WEBVTT

1
00:00:02.000 --> 00:00:04.482
Watch how the robot places the part.

2
00:00:06.833 --> 00:00:12.421
Once the part is in place and the gripper lets go, we can mark the task as finished.

3
00:00:12.601 --> 00:00:15.181
In DS, a task is called a Work.

4
00:00:15.361 --> 00:00:18.761
A completion bit records that the task has ended.

5
00:00:19.867 --> 00:00:25.145
When the previous task is finished and the next one is ready, it can start.

6
00:00:25.325 --> 00:00:27.918
A Start arrow connects this order.

7
00:00:28.098 --> 00:00:34.401
Moving, lowering, and opening the gripper can each be a Work, with its own completion to check.

8
00:00:35.500 --> 00:00:40.565
To process the next part, we need to clear the previous completion record.

9
00:00:40.800 --> 00:00:47.203
After the part is removed, starting the removal-check Work resets the linked inspection completion.

10
00:00:47.383 --> 00:00:51.156
We add the Resets needed for each task we want to repeat.

11
00:00:52.267 --> 00:00:56.697
A System groups Works under the same control responsibility.

12
00:00:56.877 --> 00:01:01.460
A coordinates the sequence. B moves the part. C inspects it.

13
00:01:01.640 --> 00:01:06.862
B has two transfer paths: buffer to alignment, then alignment to inspection.

14
00:01:07.042 --> 00:01:11.286
The buffer has a three by three layout, holding up to nine parts.

15
00:01:12.367 --> 00:01:20.231
ApiDef defines an offered task and how completion is confirmed. B offers two transfers; C offers inspection.

16
00:01:20.411 --> 00:01:27.996
A first uses a Call inside its alignment Work to request B: pick from the buffer and place at alignment.

17
00:01:28.176 --> 00:01:34.765
After completion, the next Work calls B again: pick from alignment and place at inspection.

18
00:01:34.945 --> 00:01:43.430
Then the inspection Work calls C. Each Work in A finishes when its Call and its own completion conditions are satisfied.

19
00:01:44.533 --> 00:01:49.891
Each Call sends a command and observes completion through TAGs at both ends.

20
00:01:50.071 --> 00:01:55.777
Transfer commands go from A.OUT to B.IN. Completion returns from B.OUT to A.IN.

21
00:01:55.957 --> 00:02:02.015
Inspection signals run directly between A and C. B does not command C to inspect.

22
00:02:02.195 --> 00:02:11.774
Inspection completion and pass or fail are different information. After the operator removes the part, A checks readiness for the next cycle.

23
00:02:12.867 --> 00:02:22.088
Lowering an axis, opening the gripper and returning it empty are detailed Works inside B. They support its two product transfer paths.

24
00:02:22.268 --> 00:02:31.028
To expand the machine, add Works, connections and agreements between Systems. AAS shares standard device information.

25
00:02:31.208 --> 00:02:37.993
From one finished task to cooperation between complex Systems, the same principles carry through.