1
00:00:02,000 --> 00:00:04,482
Watch how the robot places the part.

2
00:00:06,833 --> 00:00:12,421
Once the part is in place and the gripper lets go, we can mark the task as finished.

3
00:00:12,601 --> 00:00:15,181
In DS, a task is called a Work.

4
00:00:15,361 --> 00:00:18,761
A completion bit records that the task has ended.

5
00:00:19,867 --> 00:00:25,145
When the previous task is finished and the next one is ready, it can start.

6
00:00:25,325 --> 00:00:27,918
A Start arrow connects this order.

7
00:00:28,098 --> 00:00:34,401
Moving, lowering, and opening the gripper can each be a Work, with its own completion to check.

8
00:00:35,500 --> 00:00:40,565
To process the next part, we need to clear the previous completion record.

9
00:00:40,800 --> 00:00:47,203
After the part is removed, starting the removal-check Work resets the linked inspection completion.

10
00:00:47,383 --> 00:00:51,156
We add the Resets needed for each task we want to repeat.

11
00:00:52,267 --> 00:00:56,697
A System groups Works under the same control responsibility.

12
00:00:56,877 --> 00:01:01,460
A coordinates the sequence. B moves the part. C inspects it.

13
00:01:01,640 --> 00:01:06,862
B has two transfer paths: buffer to alignment, then alignment to inspection.

14
00:01:07,042 --> 00:01:11,286
The buffer has a three by three layout, holding up to nine parts.

15
00:01:12,367 --> 00:01:20,231
ApiDef defines an offered task and how completion is confirmed. B offers two transfers; C offers inspection.

16
00:01:20,411 --> 00:01:27,996
A first uses a Call inside its alignment Work to request B: pick from the buffer and place at alignment.

17
00:01:28,176 --> 00:01:34,765
After completion, the next Work calls B again: pick from alignment and place at inspection.

18
00:01:34,945 --> 00:01:43,430
Then the inspection Work calls C. Each Work in A finishes when its Call and its own completion conditions are satisfied.

19
00:01:44,533 --> 00:01:49,891
Each Call sends a command and observes completion through TAGs at both ends.

20
00:01:50,071 --> 00:01:55,777
Transfer commands go from A.OUT to B.IN. Completion returns from B.OUT to A.IN.

21
00:01:55,957 --> 00:02:02,015
Inspection signals run directly between A and C. B does not command C to inspect.

22
00:02:02,195 --> 00:02:11,774
Inspection completion and pass or fail are different information. After the operator removes the part, A checks readiness for the next cycle.

23
00:02:12,867 --> 00:02:22,088
Lowering an axis, opening the gripper and returning it empty are detailed Works inside B. They support its two product transfer paths.

24
00:02:22,268 --> 00:02:31,028
To expand the machine, add Works, connections and agreements between Systems. AAS shares standard device information.

25
00:02:31,208 --> 00:02:37,993
From one finished task to cooperation between complex Systems, the same principles carry through.